This technical guide provides step-by-step instructions to safely install and configure the GEA G-Force panel software manually. Pre-Installation Requirements

mysql -u root -p

This guide provides a comprehensive, step-by-step walkthrough for a successful installation, from initial preparation to final startup.

A manual install leaves some security tasks to you:

| Item | Specification | |------|----------------| | | GEA Gforce Panel (correct model for your machine) | | Cables | Power supply, Ethernet/Profinet, fieldbus (if applicable) | | Software | GEA Gforce firmware ( .img or .pkg file), GEA HMI application ( .gfh or similar) | | Tools | Phillips screwdriver, Torx T10, grounding strap, USB flash drive (FAT32, ≤32GB) | | Documentation | Machine wiring diagram, GEA panel manual (part no. 1000-XXXX) |

Disable SELinux (temporarily, as G-Force Panel works best with it disabled):

Perform thorough testing and validation to ensure the GEA gForce panel is functioning correctly:

To execute a secure baseline checkout, follow the structured testing loops verified by the GEA Retrofit Manual documentation archive :

A manual installation requires landing your power supply, sensor inputs, and digital outputs to the correct internal terminal blocks. Power Supply

| Terminal | Connection | Wire spec | |----------|------------|------------| | X1 (L/N/PE) | 24 VDC (or 230 VAC – check label) | 1.5 mm² | | X2 (ETH1) | Machine PLC (e.g., Siemens S7) | Cat6 shielded | | X3 (USB) | For firmware/backup | USB 2.0 | | X4 (Service) | PC for engineering access | Null-modem or USB-B |

Standard FAT32 formatted USB flash drive (4GB to 16GB recommended)

On the maintenance touchscreen menu, select or Update Firmware .

A sealed USB port is provided for data transfers and program updates, while an Ethernet port supports Modbus TCP/IP and EtherNet/IP . 4. Manual Configuration and Calibration

: Command the load solenoid loop to drive the internal slide valve assembly fully forward until raw milliamp tracking stops moving. Depress the LDS hardware calibration switch twice to lock in the high offset threshold. Save 100% capacity parameters to complete the loop. Step 5: Post-Install Operational Checkout

Import the schema from the source folder:

Before diving into wires and code, it is vital to understand what these components are and why a manual installation is often necessary.

Since “manual install” often means , follow this procedure: